Scaffold to the top of both towers
The penthouses sit at the very top of two towers, so the first job was getting there: scaffold up to the roofline of both.

Waterloo, NSW · Penthouse upgrades
A complete upgrade of the penthouses across two Waterloo towers: compliant cladding, new waterproofing, suspended tiles, new facade finishes and eight new jacuzzis.
2
Towers
8
Jacuzzis replaced
The penthouses had non-compliant cladding and failing waterproofing, and they sit at the very top of two towers, where access is hardest.
Working from scaffold, we replaced the cladding, re-waterproofed and re-tiled on a suspended tile system, and renewed the facade finishes. For the eight jacuzzi replacements, we utilised one of TWC's 120T cranes which involved notifying Sydney Kingsford Smith airport due to its size and the site's proximity.


The penthouses sit at the very top of two towers, so the first job was getting there: scaffold up to the roofline of both.
The non-compliant cladding came off the penthouses and compliant cladding went on, with new facade finishes to match.
The failing waterproofing was stripped and renewed, and the terraces re-tiled on a suspended tile system, so water runs off underneath rather than sitting in the bed.
The eight jacuzzis were lifted out and their replacements in with one of TWC’s 120-tonne cranes. At that size, and this close to the airport, Sydney Kingsford Smith had to be notified. Every spa area got new composite decking.
Watertight penthouses, jacuzzis back in.
Next case study · CremorneA face lift for an '80s icon.