Young Street, Cremorne from the air after the works
← All projects

A face lift for an '80s icon.

Cremorne, NSW · Facade, waterproofing, windows, doors & balustrades

A major Class 2 residential upgrade: balcony re-waterproofing, suspended paving, new windows, doors and structural glass balustrades, facade remediation and protective coatings, all in a fully occupied building.

Location
Cremorne, NSW
Sector
Residential strata
Value
$4.5M
Duration
13 months
Lead consultant
Diagnostech

$4.5M

Project value

13

Months on site

9

Scopes of work, one builder

Failing waterproofing had caused chronic water penetration. Windows and doors were affected and no longer working as they should. Non-compliant balustrades on the roof and balconies were a significant safety risk, and cracking and concrete spalling on the facade were shortening the life of the building.

SRS worked with the consultant team and specialist contractors to address all of it at once. Staged works, detailed resident communication and careful coordination between the external envelope and internal access kept a fully occupied building running throughout.

Before and after.

The corner balconies after: remediated, recoated, with frameless glass balustrades
The corner balconies before the works, with the old framed balustrades
The corner balconies before and after: facade remediated and recoated, new glass balustrades.

The works

01

Live, occupied, staged

The building was wrapped and worked on in stages while residents lived in it, with detailed communication throughout and the external works coordinated around access to every apartment.

02

Roof and balcony balustrades

The non-compliant balustrades on the roof and every balcony came out, replaced with toughened laminated glass on polished stainless steel stand-offs with interlinking handrails, all to current codes.

03

Windows and doors

Every window and door was replaced with units that meet or exceed current codes for wind load and water pressure: AWS systems made in regional NSW on a new production line, in a custom long-life powder-coat colour.

What SRS did

  1. 01Rectified all concrete spalling
  2. 02Soft washed the aged brickwork
  3. 03Repointed missing mortar
  4. 04Replaced all windows and doors
  5. 05Waterproofed and re-tiled all decks
  6. 06Replaced cavity flashings
  7. 07Replaced and upgraded all balustrading with a site-specific tested system
  8. 08Rectified drainage issues
  9. 09Protective coatings to previously painted surfaces
Lead consultant
Diagnostech

A logistically challenging project and an outstanding team effort, delivering a renewed facade and living spaces for residents to enjoy for many years to come.

Next case study · Hunters HillA zinc roof on top, a membrane roof underneath.

Got a building like this one?