Falls, at last
The new screed falls 1% to every outlet, with new 100mm drainage points to the rain-heads and 100mm emergency overflows.

Vaucluse, NSW · Insulated roof replacement
Water pooled up to 100mm deep under the metal roof of this Vaucluse apartment block. We replaced it with an insulated membrane roof that drains to every outlet.
100mm
Of water pooling under the old roof
19
Copper vent stacks
5
New skylights
The original roof was 20mm of hot-poured bitumen on a slab that had reverse falls, covered by a timber frame and a concealed-fix metal roof with an internal box gutter. The gutters were poorly designed, and water pooled under the metal roof up to 100mm deep.
We took off the metal roof and its framing but kept the old bitumen as a base. Over it went mechanically fastened XPS insulation, a slip sheet, a reinforced screed laid to falls and a fully bonded Sika Sarnafil membrane.
The new screed falls 1% to every outlet, with new 100mm drainage points to the rain-heads and 100mm emergency overflows.
While the roof was open we added solar-powered skylights on new concrete upstands, concrete exhaust stacks with speed-controlled fans, 19 copper vent stacks, and new TV cabling and antenna.
Insulated, compliant, and the water drains away.