Macquarie Park, NSW · Roof remedial works
At 40 Talavera Road, water was getting into tenancies through the roofs of three office buildings. We relined the box gutters and replaced cappings, cladding, and whole roof sections, while the offices below stayed in use.
- Location
- Macquarie Park, NSW
- Building
- Three-building office campus, fully tenanted
- Completed
- 2021
- Value
- $547k
3
Office buildings
$547k
Of works
The challenge
Leaks into occupied offices from three roofs of different ages, with corroded cappings, tired gutters and dozens of plant and service penetrations.
Our response
We worked building by building: PVC-lined box gutters and new overflows, new parapet and ridge cappings, flashings to every roof penetration, new roof sheeting on Buildings 1 and 3, replacement perimeter cladding and window flashings, then water-tested the result. Weekend shifts kept noisy work away from the tenants.
Where it started.
Scope of works
- 01Box gutters lined in PVC
- 02New vertical overflows
- 03Parapet and ridge capping replacement
- 04Small and large roof penetrations flashed
- 05Gutter mesh and intermediate flashings
- 06Drainage CCTV inspection and downpipe replacement
- 07Translucent roof hatch
- 08New roofs on Buildings 1 and 3
- 09Perimeter roof cladding replaced
- 10Window flashings
- 11Water testing
Three roofs, dry again.