The finished 24-metre lap pool, lit, under a timber-battened ceiling
← All projects

A transformation above and below the surface.

St Leonards, NSW · Pool, spa & amenities upgrade

One of SRS's most complex pool and amenities projects to date: specialist pool construction, building services, waterproofing and a complete refurbishment of the residents' recreation area.

Location
St Leonards, NSW
Sector
Residential strata
Value
$4M+
Lead consultant
Diagnostech
Architect
Woodman Architects

$4M+

Total project value

3

New suspended pools

$1M+

Plant room upgrade

The scope went well beyond the visible finishes. Three new suspended pools sat directly above a plant room that needed a complete upgrade, and the structural, hydraulic, electrical and mechanical work all had to be coordinated with the architectural finishes and accessibility improvements.

SRS worked with the consultant team and specialist contractors to deliver an integrated solution: renewed pool infrastructure, upgraded building systems, and recreation spaces designed around residents' access and enjoyment.

Where it started.

Before and after.

The finished lap pool from the same end
The original lap pool and timber deck
The original lap pool and deck, and the finished pool from the same end.

The works

01

Three new suspended pools

  • 24-metre lap pool with racing lanes
  • Dedicated children's wading pool
  • Heated spa with hydro jets
02

A $1M+ plant room

Complete replacement of the filtration, sanitation, electrical, hydraulic and control systems, supporting the renewed pool facility.

03

Infinity-edge conversion

The lap pool was converted from traditional skimmers to an infinity-edge weir, finished with Metz finger-grip tiles. Internal tiling to the drainage gutter protects the membrane underneath.

04

Waterproofing and mosaics

The pool structure uses the Laticrete 25-year warranty system: epoxy coatings, a 254 flat-trowel application, five layers of Hydro Ban, and epoxy adhesives and grouts. Premium Spanish glass mosaics, made to the latest hot-melt dot standards, finish the pools.

05

Better access

Previously stepped levels were converted into one continuous level, giving compliant access throughout the recreation area. A new accessible bathroom with automatic door access further improved the facility.

A comprehensive amenities upgrade

  1. 01Replacement ceilings and high-strength framing
  2. 02Fire system upgrades
  3. 03Electrical rewiring back to building sub-mains
  4. 04LED and architectural feature lighting
  5. 05Mechanical ventilation, air-conditioning and exhaust
  6. 06New doors, windows and Jalousie louvre systems
  7. 07Mario Romano feature wall from Santa Monica, CA
  8. 08Sika Sarnafil membrane systems
  9. 09Suspended paving throughout the recreation areas
Lead consultant
Diagnostech
Architect
Woodman Architects
Structural engineers
BEC
Electrical engineer
Electrical Projects Australia
Internal fitout
Elac
Hydraulics
Trisley Hydraulics
Mechanical
L2C

A technically challenging project and an outstanding team effort, delivering a renewed space designed to serve residents for many years to come.