A high-rise roof membrane, replaced in 10 days.
Miranda, NSW · Roof membrane replacement
The roof membrane on this high-rise apartment complex in Miranda had failed. We replaced it with Fatra 807V in ten days.
- Location
- Miranda, NSW
- Building
- High-rise apartment complex
- Duration
- 10 days
- Membrane
- Fatra 807V
10
days to replace the roof membrane
The challenge
The existing roof membrane had failed, over a building full of occupied apartments.
Our response
We replaced it with Fatra 807V, a high-performance roofing system with a long track record in Australia. On critical roofs like this we only use proven products.
Where it started.
Scope of works
- 01Failed roof membrane removed
- 02Fatra 807V membrane roof installed
The film.
Ten days, and the roof is watertight again. That's the SRS difference.