The cladding in three weeks. Then the roof.

Crows Nest, NSW · Cladding replacement & roof waterproofing

An apartment building in Crows Nest needed its non-compliant cladding replaced, urgently. We had it done in three weeks, and the owners later brought us back to re-waterproof the roof.

Location
Crows Nest, NSW
Building
Apartment building
Cladding
Solid alloy on heavy-duty framing, in 3 weeks
Roof
New PVC membrane, drainage, flashings and roof anchors
Access
Swing stages

3

weeks to replace the cladding

The building’s cladding didn’t comply with the regulations, and it couldn’t wait. Later, the roof: its old membrane was cracked and patched all over, and letting water in.

We removed the cladding and installed solid alloy on new heavy-duty framing, fully compliant, working from our own swing stages to keep the programme tight. When the owners brought us back for the roof, we stripped the old membrane and laid a new one, with new drains, Colorbond flashings and roof anchors sealed into it.

The works

01

First, the cladding

The non-compliant cladding came off and solid alloy went on, over new heavy-duty framing, in three weeks.

02

Then, the roof

The old, patched membrane was stripped and replaced, with new drains, flashings around every upstand and roof anchors sealed into the new membrane.

Scope of works

  1. 01Non-compliant cladding removed
  2. 02New heavy-duty framing
  3. 03Solid alloy cladding installed
  4. 04Full compliance with current regulations
  5. 05Old roof membrane stripped
  6. 06New PVC roof membrane
  7. 07New drains and Colorbond flashings
  8. 08Roof anchors sealed into the membrane

The film.

Same building, same builder: the cladding, then the roof.

Next case study · MirandaA high-rise roof membrane, replaced in 10 days.