Waterproofing that went in before the building did.
Bombala, NSW · Environmental geo-membrane
At a timber processing plant in Bombala, we laid 2,000m² of SikaProof geo-membrane before the slabs, beams and processing structures went in, to stop toxic chemicals leaching into the soil.
- Location
- Bombala, NSW
- Building
- Timber processing plant
- Duration
- 3 months
- Value
- $750k
- System
- SikaProof geo-membrane
2000m²
Of geo-membrane
3
Months on site
$750k
Of works
The challenge
Timber processing uses chemicals that can’t be allowed into the surrounding soil. The protection had to be in place before anything was built on top of it.
Our response
We laid 2,000m² of SikaProof geo-membrane across the site, ready for the concrete slabs, beams and processing structures to go on top.
Scope of works
- 012,000m² of SikaProof geo-membrane
- 02Laid before the slabs, beams and processing structures
- 03Protection against chemicals leaching into the soil
Out of sight, and keeping the ground clean.