Reinforcing mesh laid over white membrane on a site slab, containers behind
← All projects

Waterproofing that went in before the building did.

Bombala, NSW · Environmental geo-membrane

At a timber processing plant in Bombala, we laid 2,000m² of SikaProof geo-membrane before the slabs, beams and processing structures went in, to stop toxic chemicals leaching into the soil.

Location
Bombala, NSW
Building
Timber processing plant
Duration
3 months
Value
$750k
System
SikaProof geo-membrane

2000m²

Of geo-membrane

3

Months on site

$750k

Of works

Timber processing uses chemicals that can’t be allowed into the surrounding soil. The protection had to be in place before anything was built on top of it.

We laid 2,000m² of SikaProof geo-membrane across the site, ready for the concrete slabs, beams and processing structures to go on top.

Scope of works

  1. 012,000m² of SikaProof geo-membrane
  2. 02Laid before the slabs, beams and processing structures
  3. 03Protection against chemicals leaching into the soil

Out of sight, and keeping the ground clean.