Award-winning repairs to a critical substation.
North Sydney, NSW · Waterproofing & concrete repair
In five weeks we stopped the water getting into a North Sydney substation, protected and repaired its concrete, and made a 1.6-tonne access hatch for the job. It won an ACRA Award.
- Location
- North Sydney, NSW
- Building
- Electrical substation
- Duration
- 5 weeks
- Value
- $300k
- Recognition
- ACRA Award
5
Weeks on site
1.6t
Access hatch, made for the job
$300k
Of works
The challenge
A substation is critical infrastructure. Water had to be kept out for good, and every step needed careful planning and tight safety controls.
Our response
We waterproofed the structure against water entry, installed sacrificial anodes to protect the reinforcement, repaired the concrete, laid hot-mix asphalt and manufactured a 1.6-tonne access hatch.
Where it started.
Scope of works
- 01Waterproofing and water entry mitigation
- 02Sacrificial anode installation
- 03Concrete repair
- 04Hot-mix asphaltic concrete
- 05A 1.6-tonne access hatch, manufactured for the job
Five weeks, and an ACRA Award.