Keeping the water out of an MRI clinic.
Westmead, NSW · Car park deck waterproofing
At a medical building in Westmead, water from the Level 1 car park deck was getting into the imaging clinic below. We stripped the deck, waterproofed it and resurfaced it, with the noisiest work done over the Christmas shutdown.
- Location
- Westmead, NSW
- Building
- Medical building: imaging and IVF clinics
- Duration
- 4 months
- Completed
- April 2025
- Value
- $500k
4
Months, start to finish
$500k
Of works
The challenge
Water was getting through the Level 1 car park deck into the ground-floor MRI clinic, where a single machine is worth over a million dollars, and neither clinic could close for the works.
Our response
We removed the asphalt, waterproofed the deck, laid new asphalt, installed a new channel drain and scuppers, raised the door threshold and repainted the walls. Demolition was timed for the tenants’ Christmas shutdown.
Where it started.
Scope of works
- 01Asphalt removed
- 02Car park deck waterproofed
- 03New asphalt laid
- 04New channel drain and scuppers
- 05Door threshold raised
- 06Walls repainted
Watertight above, all while the clinic’s work carried on below.
Next case study · WarrawongFacade repairs on a working public hospital.