Greenwich undercroft: concrete columns and beam, looking up at the building
← All projects

Holding up a five-storey building, at short notice.

Greenwich, NSW · Structural strengthening

The undercroft of an occupied five-storey apartment building in Greenwich had decayed to the point of danger. We propped it at short notice, then strengthened it for good.

Location
Greenwich, NSW
Building
Five-storey apartment building, occupied
Works
Emergency propping, column jackets, carbon fibre

The structure in the undercroft had decayed badly. Left much longer without proper repairs, a catastrophic failure was a real possibility, with residents living above.

We put up scaffold and emergency propping at short notice. Then we cast reinforced high-strength jackets around the columns to restore and increase their strength, strengthened the beams (including with carbon fibre) and repaired the spalling concrete.

Where it started.

The works

01

Make it safe

Short-notice scaffold and Shore 400 series emergency props took the load first.

02

Make it stronger

Reinforced high-strength column jackets restore the columns and add strength. Beams were strengthened, with carbon fibre where needed, and spalling repaired throughout.

Scope of works

  1. 01Short-notice scaffold and emergency propping (Shore 400 series)
  2. 02Reinforced high-strength column jackets
  3. 03Beam strengthening, including carbon fibre
  4. 04Concrete spalling repairs

Made safe first, then made stronger.

Next case study · ChatswoodBalconies that finally stay dry.